| Administration and Engineering Building(A&E) |
41 |
30-C |
| Alpine Gate Guard House |
88 |
40-I |
| Arrillaga Recreation Center |
55 |
37-D |
| Auxiliary Control Building |
3 |
27-F |
| Beam Switch Yard Access |
9 |
32-G |
| Cafeteria |
42 |
31-C |
| Central Hazardous Waste Mgmt Area |
245 |
27-G |
| Central Laboratory |
40 |
31-D |
| Central Laboratory Annex |
84 |
32-D |
| Central Utility Building |
23 |
31-D |
| Chemical Storage Building |
36 |
29-E |
| Cleaning Facility Building |
30 |
29-F |
| Collider Experimental Hall (CEH) |
750 |
39-E |
| Communications Office |
266,267 |
30-E |
| Computer Building (SCS) |
50 |
32-E |
| Controls Building |
34 |
28-F |
| Cryogenics Laboratory |
6 |
33-E |
| End Station A (ESA) |
61 |
34-E |
| End Station B |
62 |
34-F |
| Environmental Protection Restoration |
299 |
28-F |
| Environmental Safety and Health (E,S&H) |
24 |
28-E |
| Exercise Room/Shops Dining Room |
27 |
28-E |
| Experimental Facilities Department Shops
(EFD) |
104 |
35-F |
| Fire Station |
82 |
30-D |
| Gate 17 Guard House |
86 |
33-D |
| General Services Building (Shipping & Receiving) |
81 |
26-E |
| Stanford Guest House |
49 |
33-B |
| Hazardous Waste Storage Area |
447 |
28-G |
| Heavy Fabrication Building |
26 |
30-E |
| Kavli Building |
51 |
31-B |
| Klystron Gallery (Visitors Alcove, Sector 27) |
2 |
27-F |
| Laboratory Offices and Shops (LOS) |
137 |
33-E |
| LCLS Beam Transport Hall |
910 |
33/34/35-F |
| LCLS Far Hall Tunnel Entrance |
767 |
40-E |
| LCLS Near Hall |
930/940/950 |
37/38-F |
| LCLS Office Building |
901 |
37-F/G |
| Light Assembly Building |
33 |
28-E |
| Light Fabrication Building |
25 |
29-E |
| Main Control Center (MCC) |
5 |
32-F |
| Main Gate (Information Booth) |
83 |
31-B |
| Master Substation |
16 |
30-F |
| Medical (Room 11) |
28 |
30-E |
| Metal Stores Shelter |
29 |
29-F |
| Operations Support Building |
28 |
30-E |
| Panofsky Auditorium and Visitor Center |
43 |
31-C |
| PEP Beam Facility/SSRL |
650 |
36-I |
| PEP Beam Facility/SSRL |
730 |
37-C |
| PEP Control Room |
685 |
33-H |
| PEP Interaction Region 2 (IR-2) |
620 |
38-D |
| PEP Interaction Region 4 (IR-4) |
640 |
38-H |
| PEP Interaction Region 6 (IR-6)) |
660 |
35-I |
| PEP Interaction Region 8 (IR-8) |
680 |
32-H |
| PEP Interaction Region 12 (IR-12) |
720 |
35-B |
| Physics and Engineering Building |
280 |
29-D |
| Plant Maintenance and Utilities |
35 |
27-E |
| Power Conversion |
15 |
29-G |
| Research Office Building (ROB) |
48 |
30-B |
| Safeguards and Security |
235 |
31-B |
| Sector 30 Guard House |
85 |
31-F |
| SLC Engr. Trailer South (Fort Apache) |
282 |
32-F |
| SPEAR Control Room |
117 |
34-D |
| Stanford Synchrotron Radiation Lab (SSRL) |
120 |
34-D |
| Stanford Synchrotron Radiation Lab (SSRL) |
131 |
34-E |
| Test Beam Facility |
121 |
35-F |
| Test Laboratory |
44 |
30-D |
| Vacuum Assembly Building |
31 |
31-F |
| Visitor Center |
43A |
31-C |